Mammoet/Trouw Case Study

Mammoet/Trouw Case Study

Mammoet/Trouw Case Study Flexibility and ease of power/technology integration in order to be able to adapt to change is best demonstrated over time. In late 2014, Verto360 completed the design and build out of 30,000 S/F of office space for the Dutch company Mammoet...
MNP

MNP

MNP MNP is a Nationwide accounting and business advisory firm.  This 67 year old company is rapidly growing while ensuring they maintain their culture and consistency in their physical environments.  They have years of experience with using DIRTT in multiple locations...
Humber College

Humber College

Humber College When Humber College was looking to renovate their School of Business, they were looking for a visually stunning solution that would create a modern, innovative space for the students of today and the future.  Verto360 was able to take the concept images...
Cambridge Memorial Hospital

Cambridge Memorial Hospital

Cambridge Memorial Hospital Verto360 has been a part of the Cambridge Memorial Hospital revitalization project since it was first developed in 2013.  Even at the birth of this project the Hospital could see the benefits of building with DIRTT and the flexibility that...
London City Hall – 6th Floor

London City Hall – 6th Floor

London City Hall – 6th Floor Over the past year the 6th floor of City Hall has undergone extensive transformation.  There was a need to get more bodies in the space and still a need for more compact private office space.  Luckily enough, back in 2010 the City...