Project Details

In 2016, McMaster University constructed a cutting-edge, 14,000-square-foot space at the Ron Joyce Centre – DeGroote School of Business with Verto360 and DIRTT’s prefabricated solutions, confident in its future-ready capabilities. Nearly a decade later, they returned to us for a reconfiguration—demonstrating the true power of adaptable design.

Location

Burlington, Ontario

Industry

Education

Square Footage

Approx. 300

Change Orders

0

Installation Time

1 day

Goals & Outcomes

Fully Functional Office Space—Completed Without Noise, Chaos, or Downtime

As McMaster’s team grew and their operations evolved, they needed an additional office—one that would offer privacy, support daily interactions, and, most importantly, be created with minimal disruption to their team. Verto360 stepped in to reconfigure their existing modular walls, add new frames, and install a door, all over a single weekend. By Monday morning, McMaster had a new, fully functional office space—completed without noise, chaos, or downtime.

The new office blended perfectly with the surrounding design by reusing materials and matching new components with the existing selections. It was a seamless transformation, exceeding expectations in every way.

Project Partners

  • Solution Partners: DIRTT

Notable Features

Thanks to Verto360 and DIRTT’s modular construction system, this office addition came together quickly and easily.

The Transformation

Seamless Solutions In Action

Verto360’s pre-engineered solutions with DIRTT showcase how quickly and smoothly a space can evolve to meet changing needs. For McMaster, the result was a new office that emerged literally overnight, demonstrating the powerful impact of flexible, prefabricated construction.


McMaster’s updated space isn’t just modern—it’s an investment in adaptability, innovation, and the future. With minimal drywall, enhanced flexibility, and a sustainable approach.

-