Project Details
When Prime Industrial Electric Corporation set out to retrofit their new office space in Oakville, Ontario, they had a clear goal: speed, precision, and a high-quality finish. As specialists in industrial electrical services, they needed their new space to reflect the forward-thinking nature of their company—while ensuring the process was clean, fast, and with minimal disruption to their daily operations.
Prime Industrial Electric needed their employees back to work as soon as possible, and that’s why they turned to Verto360.
Location
Oakville, Ontario
Industry
Corporate
Square Footage
4,783
Change Orders
0
Installation Time
3 weeks
Goals & Outcomes
Fast, Efficient, and Built to Last
Time was the key factor for Prime Industrial Electric. They couldn’t afford the delays, mess, and unpredictability that often come with traditional on-site construction. They needed a partner who could deliver a turnkey solution that was fast, efficient, and built to last—all without sacrificing the high standard of fit and finish they demanded.
Prime Industrial Electric chose the Verto360 process and DIRTT manufactured solutions because they offered something other approaches couldn’t—lightning-fast lead times of 21-28 days, including installation by certified technicians. This turnkey solution ensured that their office space was not only completed quickly but also built to exact specifications, minimizing disruption to their business and allowing employees to return to work as soon as possible.
Using DIRTT’s manufactured construction system, Prime Industrial Electric’s office was designed and built with clean, modern finishes that reflected their progressive corporate culture—all while avoiding the delays and mess of traditional construction methods like drywall and dropped ceilings.
Project Partners
Solution Partners: DIRTT, McCallumSather, Prime Trades
Notable Features
Thanks to Verto360 and DIRTT’s modular construction system, Prime Industrial Electric
achieved their vision of a modern, flexible workspace. Here’s how it all came together:
DIRTT Walls with Embedded Tech, Doors, and Casework
These features gave the office a sleek, high-tech finish while maintaining the flexibility to easily reconfigure or expand in the future. We also supplied a pre terminated power solution that made the solution an ease to install. The walls are also all standalone walls that did not have bulkheads above and did not need to run to the deck. The support structure was built into the DIRTT walls to create this modern looking space. We integrated the ceiling grid J mold support system into the DIRTT walls to assist with the drop in ceilings. Low walls were created to break up open work areas and provide power in the open areas.
Zero Change Orders
The entire project was completed with zero change orders, a testament to the precision and careful planning that Verto360 brought to the table.
Speed & Efficiency
With a 21-28 day (4 Weeks for manufacturing and delivery and 3 weeks for installation) turnaround, Verto360 ensured that Prime Industrial Electric’s team was back in the office and operational with minimal downtime.
The Transformation
Flexibility at the Forefront
The benefits of working with Verto360 didn’t stop once the project was complete. Thanks to
the modular design of the DIRTT system, Prime Industrial Electric now has the ability to add,
move, or reconfigure elements of their office space as their needs change—without excessive
disruptions or costs.
This is the power of a future-proof workspace—one that evolves with the business and
supports its growth for years to come.
For Prime Industrial Electric, choosing Verto360 was about more than just speed—it was
about creating a space that reflects their forward-thinking approach to the industry. By
leveraging the flexibility of DIRTT solutions, Verto360 delivered an office that’s as dynamic as
the company itself, all while ensuring that the process was fast, efficient, and built to last.
We didn’t just get an office—we got a partner who understood our vision and made it a reality. Their approach saved us time, money, and a lot of stress.