Project Details

Siskinds Law Firm (Siskinds LLP) faced the common dilemma of a growing organization: their existing office space no longer met their evolving needs. Located in the downtown core of London, Ontario, the firm sought not just a new address but a revolutionary approach to legal workspace design.

Location

London, Ontario

Industry

Corporate

Square Footage

60,000

Change Orders

Installation Time

Originally planned for 11-12 weeks (COVID shutdowns led to delays, with the project ultimately taking 20 months in total)

Goals & Outcomes

A State-Of-The-Art Legal Office for the Modern Era

Verto360 stepped in with our cutting-edge prefabricated construction technology, offering Siskinds a tailored solution that promised efficiency, flexibility, and a modern aesthetic. The collaboration focused on creating a space that embodied the firm’s innovative spirit, emphasizing acoustic privacy, modular adaptability, and a forward-thinking layout. Throughout the course of the project, Siskinds was able to uncover the tangible benefits of the flexibility prefabricated construction offers - and created a space that would serve their immediate needs and easily adapt in the future.

Project Partners

Notable Features

Enhanced Acoustic Privacy

Enhanced acoustics, essential for confidentiality in legal proceedings - especially as many hearings and proceedings were held virtually during the COVID-19 pandemic.

Adaptive Design

Modular offices and technology-ready spaces designed for easy reconfiguration, supporting growth and technological updates with minimal disruption.

Sustainable Construction

Prefabricated elements significantly reducing onsite waste and change orders, aligning with environmental and budget goals.

The Transformation

A Seamless, Adaptable Construction Process

Despite the unforeseen challenges posed by COVID-19, the project avoided many traditional construction constraints, completing the 60,000 square foot space with remarkable efficiency and a drastic reduction in change orders and cost increases. This outcome not only demonstrated Verto360’s resilience but also underscored the adaptability and precision of prefabricated construction.

Our new offices are fantastic and came in on budget in a very challenging environment: COVID. Going with prefabricated construction is a large part of the reason why.

-
Fred G. Rose
CEO, Siskinds | The law firm